S.Raghuraman v. The Secretary

DISPOSED OF
Court
High Court of Madras
Decided
16 February 2026
Bench
S.M. Subramaniam, C.Kumarappan
Case no.
WP 3912/2022

Follow Madras High CourtFollow S.M. SubramaniamFollow C.Kumarappan

Judgment

O R D E R (Order of the Court was made by S.M.Subramaniam J.) Writ Petition has been instituted to direct the respondents 2 and 3 to complete the Railway Project after removal of encroachments.

¶2Lands were acquired for Highways Projects, more specifically for construction of Railway Over Bridge. Since encroachments are identified, the Authorities are not able to implement the project.

¶3Learned counsel for the petitioner would submit that non construction of Railway Over Bridge is causing inconvenience to the public at large, resulting in hardship. Page3 of 6

¶4The Divisional Engineer, Highways filed a Status Report and details of encroachments along with Survey Numbers have been stated in Paragraph Nos.3 to 4, which read as under: "3. It is humbly submitted that pursuant to the above Writ Petition a report has been called for from the Revenue officials and the 3rd Respondent vide Na.Ka.283/2022/A1 dated 28.02.2022 regarding the encroachments in S.No.1218B/2 of No.51 Elavoor 2 Village, Gummidipoondi Taluk, Thiruvallur District. The Report of the 3rd Respondents reveals that the Patta to the land S.No.1218B/2 of Elavoor 2 Village with extent of

0.13.0 Hectares classified as Punjai stood in the name of MR.N.Mahalingam (1804) and as per Section 10(1) Chitta extract, the patta to the land stood in the name of M/s.Tamilnadu

Vincentian

Charitation

society. Subsequently the said S.No. was subdivided and reclassified in the Revenue Records as Government Land after Land Acquisition in the year 2011 for construction of Railway overbridge. The extract of the subdivision are as follows: S.No. Extent (In Hectares) Classification Patta details 1218B/ 2A

0.03.0 Punjai 1919, M/s.Tamilnadu Vincentian Charitation society 1218B/ 2B

0.07.0 Government Poramboke National

Highways (Land acquired for construction of Railway overbridge) 1218B/ 2C

0.02.0 Punjai 1919, M/s.Tamilnadu Vincentian Charitation society Total

0.13.0 The report further stated that, in the above S.No.1218B/2B with an extent of 0.07.0 hectares, an extent of 0.00.77 hectares (00077 Square Meters) has been encroached by way of a Concrete Building by the 8th Respondent. Page4 of 6

¶4It is further submitted that a Memo No.73/2022/JA/Encroachment dated 28.02.2022 has been issued to the 8th Respondent by the Assistant Divisional Engineer (H), C&M, Gummidipoondi directing the encroacher / 8th Respondent to vacate the subject land within seven days from the date of receipt of the memo. However, in response, the 8th Respondent gave an application claiming that they were not notified during the survey and requested a resurvey. Despite this, no further action has been taken by the 8th Respondent to coordinate with the Tahsildar's office for a re-survey of the land.

¶5It is further submitted that, since no action has been taken by the 8th Respondent to remove the encroachment, Final eviction notices dated 28/02/2022 have been issued by the Assistant Engineer, (H), C&M, Gummidipoondi to the encroacher / 8th Respondent to ensure that the building in the subject land is surveyed through the surveyor from Gummidipoondi Taluk office are within their boundary on or before 16.12.2024 and failure to comply, the encroachments in the land belonging to the Highways Department will be removed on 17.12.2024 with the assistance of Police Department the costs incurred for removal will be recovered from the encroacher."

¶5In view of the above Status Report, the respondents 2 to 7 are directed to remove encroachments, enabling the Authorities to Page5 of 6 implement the Public project. The said exercise is directed to be completed within a period of six weeks from the date of receipt of a copy of this order. No costs. Consequently, connected Miscellaneous Petition is closed. (S.M.S.,J.) (C.K.,J.) 16-02-2026 Index: Yes Speaking/Non-speaking order AR To:

¶1The Secretary Highways Department, Govt of Tamil Nadu, Fort St.George, Chennai-600 009.

¶2The District Collector Collectors Office, Thiruvallur District.

¶3The Tahsildar Taluk Office

¶4The Chief Engineer Construction and Maintenance Highways Department,HRS Campus, 76, Sardar Patel Road, Near Little Mount, Guindy, Chennai 600 025.

¶5The Superintending Engineer Construction and Maintenance Highways Department, Anna Salai, Teynampet, Chennai-600 006.

¶6The Divisional Engineer Construction and Maintenance, Highways Department, Near Oil Mill, Thiruvallur.

¶7The Assistant Engineer Highways Department, Near E.B. Office, Gummidipoondi, Thiruvallur District. WPoNo.o3912oofo2022 S.M.SUBRAMANIAMeJ. AND C.KUMARAPPANeJ. AR W.P.No.3912eofe2022 16-02-2026 Page6oofo6

Case details

Parties and counsel

2026:MHC:623 Page1 of 6 IN THE HIGH COURT OF JUDICATURE AT MADRAS DATED: 16-02-2026 CORAM THE HON'BLE MR JUSTICE S. M. SUBRAMANIAM AND THE HON'BLE MR.JUSTICE C.KUMARAPPAN W.P.No.3912 of 2022 and W.M.P.No.4061 of 2022 S.Raghuraman ..Petitioner -vs- 1. The Secretary Highways Department, Govt of Tamil Nadu, Fort St.George, Chennai-600 009. 2. The District Collector Collectors Office, Thiruvallur District. 3. The Tahsildar Taluk Office 4. The Chief Engineer Construction and Maintenance Highways Department,HRS Campus, 76, Sardar Patel Road, Near Little Mount, Guindy, Chennai 600 025. 5. The Superintending Engineer Construction and Maintenance Highways Department, Anna Salai, Teynampet, Chennai-600 006. 6. The Divisional Engineer Construction and Maintenance, Highways Department, Near Oil Mill, Thiruvallur. Page2 of 6 7. The Assistant Engineer Highways Department, Near E.B. Office, 8. M/s.Vincentain Charitable Trust, No.45, MTH Road, Near Canara Bank, Mahalingapuram, Ambattur, Chennai. ..Respondents Prayer: To direct the respondents 2nd and 3rd to complete scheme of bridge viably with service road after removing the encroachment by prevention of houses and shopping complex by the 8th respondent and his assignees in and under the scheme bridge affecting the service road For Petitioner: Mr.V.Narayanan For Respondents: Mr.T.Arun Kumar, AGP for R1 to 7 Mr.D.Dayanithi for R8 *****