- Court
- Supreme Court of India
- Decided
- 4 January 2023
- Bench
- Ajay Rastogi, C. T. Ravikumar
- Case no.
- Civil Appeal No. 1669 of 2020
Judgment
SABARMATI GAS LIMITED v. SHAH ALLOYS LIMITED (Civil Appeal No. 1669 of 2020) JANUARY 04, 2023 [AJAY RASTOGI AND C. T. RAVIKUMAR, JJ.] Insolvency and Bankruptcy Code, 2016 – ss. 6, 8, 9, 62, 238A, 252 – Sick Industrial Companies (Special Provisions) Act, 1985 – ss. 16, 17, 22, 25 – Limitation Act, 1963 – s.5,14 and Art. 137 – Insolvency and Bankruptcy (Application to Adjudicating Authority), Rules 2016 – r. 5, Form no. 3 – Appellant and respondent ente red into a Gas Sales Agreement (GSA) whereunder the app ellant was having the obligation to supply natural gas – There after, the respondent made default in the payment of the invoices – R espondent approached BIFR and it was declared a ‘sick unit’ – Appellant sought the permission of the BIFR for initiating proceeding s against the respondent for recovery of outstanding dues – Shortl y thereafter, the SICA was repealed w.e.f 01.12.2016 by coming in to force of IBC – Upon BIFR becoming functus officio, appellant issued demand notice u/s.8 of IBC – Respondent declined the liabili ty to pay the amount demanded – Appellant filed an application u/s. 9 of the IBC before NCLT seeking initiation of CIRP in its capacity a s operational creditor of the respondent – The said application was dismis sed by the NCLT on the grounds of being barred by limitation and exist ence of a ‘pre-existing dispute’ between the appellant and the responde nt – The appeal against the decision of NCLT was also d ismissed by NCLAT – Issues before the Supreme Court: Whether in computati on of the period of limitation in regard to an applicati on filed u/s. 9, IBC the period during which the operational credito r’s right to proceed against or sue the corporate debtor that remain suspended by virtue of s.22 (1) of the Sick Industrial Compan ies (Special Provisions Act, 1985) (SICA) can be excluded, as prov ided u/s.22
(5) of SICA and Whether the respondent has raised a dispute whic h is describable as ‘pre-existing dispute’ between it self and the appellant warranting dismissal of application u/s. 9 of the IBC at the threshold – Held: When the limitation period for initiati ng CIRP u/s. 9, IBC is to be reckoned from the date of default, as op posed to the date of commencement of IBC and the period prescribed the refor, is three years as provided by s.137 of the Limitation Act, 1963 and the same would commence from the date of default and is ext endable only by application of s.5 of the Limitation Act, 1963 it is incumbent on the Adjudicating Authority to consider the claim for condo nation of the delay – In the absence of provisions for exclus ion of period in respect of an application u/s. 9, IBC, despite the combi ned reading of s.238A, IBC and the provisions under the Limitation Act what is legally available to such a party is to assign the same as a suf ficient cause for condoning the delay u/s. 5 of the Limitation Act – As far as ‘pre-existing dispute is concerned’, considering the nature of the dispute of the respondent as referred hereinbefore in res pect of the claim made by the appellant, there is no reason to disa gree with the concurrent findings of the Tribunals that there e xisted a ‘pre-existing dispute’ between the parties before the rec eipt of demand notice u/s. 8, IBC – The dismissal of the application u/s. 9, IBC on the ground of ‘pre-existing dispute’ cannot be held t o be patently illegal or perverse. Dismissing the appeal, the Court HELD: 1. With respect to Section 7, IBC will proprio vigore apply to Section 9, IBC. In short, as relates an applicati on under Section 9, IBC the date of coming into force of IBC , viz,
01.12.2016 would not form the trigger point of limitation and the period of limitation for an application for initiating of CIRP under Section 9, IBC would be three years from the date when the right to apply accrues as provided by Article 137 of the Limitatio n Act and further that the right to apply under the IBC would accrue on the date when default occurs and it is extendable o nly by application of Section 5 of the Limitation Act. [Para 23] [209-E-F]
¶2When the limitation period for initiating CIRP und er Section 9, IBC is to be reckoned from the date of d efault, as opposed to the date of commencement of IBC and the period prescribed therefor, is three years as provided by Section 137 of the Limitation Act, 1963 and the same would commenc e from the date of default and is extendable only by application of Section 5 of the Limitation Act, 1963 it is incumbent on the Adj udicating Authority to consider the claim for condonation of the delay when once the proceeding concerned is found filed beyond th e period of limitation. As relates Section 5 of the Limitation Act showing ‘sufficient cause’ is the only criterion for condon ing delay. ‘Sufficient Cause’ is the cause for which a party c ould not be blamed. There is a legal bar for initiation of proceedings against an industrial company by virtue of Section 22 (1), SICA and obviously, when a party was thus legally disabled from resorti ng to legal proceeding for recovering the outstanding dues wi thout the permission of BIFR and even on application perm ission therefor was not given the period of suspension of exclu dable in legal proceedings is computing the period of limitat ion for the enforcement of such right in terms of Section 22(5), SICA . In the absence of provisions for exclusion of such period in re spect of an application under Section 9, IBC, despite the combined reading of Section 238A, IBC and the provisions under the Lim itation Act what is legally available to such a party is to assign th e same as a sufficient cause for condoning the delay under Sect ion 5 of the Limitation Act. In such eventuality, in accordance with the factual position obtained in any particular case viz., the period of delay and the period covered by suspension of right under Section 22 (1), SICA etc., the question of condonation of delay has to be considered lest it will result in injustice as the party was statutorily prevented from initiating action against the industrial company concerned. [Paras 24, 25][209-H; 210-A-F]
¶3The existence of a ‘pre-existing dispute’ should entail dismissal of an application filed under Section 9 I BC at the threshold. Therefore, the question is whether the r espondent had raised a dispute describable as a ‘pre-existing disp ute’ so as to entail dismissal of application of the appellant under Section 9, IBC. In the contextual situation it is only apposite to be remindful of the observation in Mobilox Innovations (P) Ltd. that in doing the act of separating the grain from chaff the Court need not to be satisfied that the defence is likely to succeed. It is enough that a dispute exists between the parties and in ot her words, what is to be seen is whether there was a plausible contention requiring investigation for the purpose of adjudicat ion. Taking note of the nature of the dispute of the respondent a s referred hereinbefore in respect of the claim made by the appell ant, there is no reason to disagree with the concurrent findin gs of the Tribunals that there existed a ‘pre-existing dispute’ between the parties before the receipt of demand notice under Sect ion 8, IBC. In other words, the dismissal of the application under Se ction 9, IBC on the ground of ‘pre-existing dispute’ cannot be held to be patently illegal or perverse. [Paras 32, 38][213-A-B; 217 -E-G] Mobilox Innovations (P) Ltd. v. Kirusa Software (P) Ltd.
(2018) 1 SCC 353; B.K. Educational Services Private Limited v. Parag Gupta and Associates (2019) 11 SCC 633 : [2018] 12 SCR 794; Babulal Vardharji Gurjar v. Veer Gurjar Aluminium Industries Private Limited and Anr. (2020) 15 SCC 1; Macquarie Bank Limited v. Shilpi Cable Technologies Limited (2018) 2 SCC 674 : [2017] 13 SCR 751 – relied on. Paramjeet Singh Patheja v. ICDS Ltd. (2006) 13 SCC 322 : [2006] 8 Suppl. SCR 178; Kailash Nath Agarwal and Ors. v. Pradeshiya Industrial & Investment Corporation of U.P. Ltd. and Anr. (2003) 4 SCC 305 : [2003] 1 SCR 1159; KSL & Industries Ltd. v. M/s. Arihant Threads Ltd. (2015) 1 SCC 166 : [2014] 14 SCR 1097; Innoventive Industries Ltd. v. ICICI Bank and Anr. (2018) 1 SCC 407 : [2017] 8 SCR 33 – referred to. Case Law Reference [2006] 8 Suppl. SCR 178 referred to Para 6 [2003] 1 SCR 1159 referred to Para 11 [2014] 14 SCR 1097 referred to Para 12 [2018] 12 SCR 794 relied on Para 20
(2020) 15 SCC 1 referred to Para 21 [2017] 13 SCR 751 relied on Para 27 [2017] 8 SCR 33 referred to Para 31 CIVIL APPELLATE JURISDICTION: Civil Appeal No. 1669 of 2020. From the Judgment and Order dated 19.12.2019 of the National Company Law Appellate Tribunal, New Delhi in Company Appeal (AT) (Insolvency) No. 820 of 2019. Shyam Divan, Sr. Adv., Piyush Joshi, Senthil Jagadeesan, Ms. Sumiti Yadava, Ms. Sonakshi Malhan, Sajal Jain, Ms. Pemya Raj, Advs. for the Appellant. Gurukrishna Kumar, Sr. Adv., Ms. Gauri Rasgotra, Sumit Attri, Ms. Ritu Anand Vishwakarma, Satatya Anand, Ms. Ena Kapur, M /s. Cyril Amarchand Mangaldas, Advs. for the Respondent. The Judgment of the Court was delivered by
C. T. RAVIKUMAR, J.
¶1This appeal under Section 62 of the Insolvency and Bankruptcy Code, 2016 (IBC) is preferred by Sabarmati Gas Limited (he reinafter referred to as the appellant) against the final judgment dated 19.12.2019 of the National Company Law Appellate Tribunal (NCLAT) in Company Appeal (AT) (Insolvency) No. 820 of 2019. As per the same the NCLAT dismissed the appeal preferred by the appellant agains t order dated
27.06.2019 in CP (IB) No. 516/9/NCLT/AHM/2018 of the National Company Law Tribunal, Ahmedabad Bench, (NCLT) dismissing the application filed under Section 9 of the IBC, in its capacity as operational creditor of ‘Shah Alloys Limited’ (hereinafter refe rred to as the ‘respondent’).
¶2In the captioned appeal mainly, twin questions of law call for consideration id est :-
(i) Whether in computation of the period of limitati on in regard to an application filed under Section 9, IBC the period during which the operational creditor’s right to proceed against or sue the corporate debtor that remain suspended by virtue of Section 22 (1) of the Sick Industrial Companies (Special Provisions Act, 1985)
(SICA) can be excluded, as provided under Section 22
(5) of SICA?
(ii) Whether the respondent has raised a dispute whi ch is describable as ‘pre-existing dispute’ between itself and the appellant warranting dismissal of application under Section 9 of the IBC at the threshold? While considering the stated twin questions certain other allie d questions of relevance may also crop up for consideration, which we will state and consider at the appropriate time. The respondent -corporate debtor was the petitioner in Case No. 13 of 2010 before the Board for Industrial and Financial Re-construction (BIFR) and the appellant herein was the applicant in Miscellaneous Application No. 432 of 2013 in Case No. 13 of 2010.
¶3Heard learned Senior Counsel for the appellant Shri Shyam Divan and Mr. S. Guru Krishna Kumar, learned Senior Counsel for the respondent.
¶4Consideration of the questions, mentioned above and to be mentioned hereinafter, is called for, in the following factual background: The respondent, for its manufacturing needs, required commercial supply of natural gas. To facilitate the same on 30.05.2008 the appellant and the respondent entered into a Gas Sales Agreement (GSA) whereby and whereunder the appellant was having the obligation to supply natural gas conforming to the specifications laid down in Annexure-2, appended to GSA and it also forms part of the contract. Going by cl ause 11.2 of GSA, notwithstanding any dispute in relation to any amount invoiced, the respondent could not withhold payment in accordance with the GSA . According to the appellant, the respondent defaulted payment of invoices inasmuch as it made only partial irregular payments from Novem ber, 2011. Meanwhile, the respondent approached BIFR to get it declared as a ‘sick unit’ and for recommendation of a plan for its rehabilitation, in terms of the provisions under SICA. The reference was admit ted by BIFR as case No. 13 of 2010 and as per order dated 31.08.2010 the respondent was declared as a ‘sick company’. It is th e case of the appellant that by virtue of Section 22 of SICA there was a moratorium on the respondent and therefore, it could not have proceeded against the respondent for outstanding dues, thenceforth, without obtaini ng the permission of the BIFR. On 07.08.2012 the appellant stopped the gas supply and then, intervened in the pending proceedings before the BIFR viz., 13 of 2010. On 08.03.2013, as per Miscellaneous Application No. 432 of 2013 the appellant sought permission of the BIFR for initiating proceedings against the respondent for recovery of an outstanding dues of Rs. 4,71,56,095/-. On 09.09.2015, the BIFR passed an order thereon. Shortly thereafter, to be precise, w.e.f. 01.12.2016, SICA was repealed.
¶5According to the appellant, BIFR became functus officio and all proceedings pending before it, including the case of the respondent, were abated and several sections of IBC, including Section s 8 and 9, came into effect on 01.12.2016. Hence, after the enactment of IBC, the appellant issued a demand notice on 01.04.2017, under Section 8 of the IBC read with Rule 5 of the Insolvency and Bankruptcy (Application to Adjudicating Authority), Rules 2016, in Form No. 3 demanding payment of operational debt of Rs. 4,71,56,094.76/-. On 10.04.2017, the respondent gave a reply to the aforesaid demand notice stating that there was shortfall in supply of natural gas and also a huge loss due to the disconnection of gas supply. Raising such contentions, the respondent declined the liability to pay the amount demanded. Thereafter, the appellant filed an application under Section 9 of the IBC before NCLT, Ahmedabad seeking initiation of Corporate Insolvency Resolution Process (CIRP) in its ca pacity as Operational Creditor of the respondent. The said application was dismissed by the NCLT as per order dated 27.06.2019 on the grounds of being barred by limitation and existence of a ‘pre-existing di spute’ between the appellant and the respondent. It is the appeal challenging the same before the NCLAT that ultimately culminated in the impugned judgment.
¶6We will firstly consider the first question of law ari sing on account of dismissal of the appellant’s application under Section 9, IBC on the ground of being barred by limitation. In the light of the aforesaid factual backdrop and contentions the appellant would contend that the NCLT and NCLAT had failed to look into and appreciate the cumulative effect of sub-sections (1) and (5) of Section 22 of SICA while dismissing the application under Section 9, IBC as barred by limitation. In elaboration of the contention, it is submitted that the NCLT and NCLAT had failed to appreciate that the respondent was admitted as a ‘sick company’ by the BIFR as per its order dated 31.08.2010 and hence, by virtue of sub-section (5) of Section 22, SICA the period of suspension under SICA viz., from 31.08.2010 to 01.12.2016, ought to have been excluded while calculating the period of limitation. According to the appellant, since the application under Section 9, IBC was filed on 20.08.2018 granting the benefit of such exclusion would have, certainly, put the application well within the limitation period of 3 years as provided under Article 137 of the Limitation Act. The learned counsel for the appellant placed reliance on the decision in Paramjeet Singh Patheja v. ICDS Ltd. 1, particularly paragraph 43 (vii) therein, to support the contention that there was a statutory bar for laying or continuing with any legal proceeding for realisation of a right vested by law on the appellant.
¶7Resisting the contentions of the appellant and supporting th e impugned judgment the respondent would contend that both NCLT and NCLAT had rightly appreciated the factual positions thereon obtained in the case on hand and appliedthe provisions correctly, to arr ive at the finding that the application filed by the appellant under Section 9, IBC was barred by limitation. According to the respondent there is discrepancy between the stand of the appellant in the Section 9 application and the Demand Notice under Section 8, of the IBC as relates the quant um of alleged outstanding dues. It is also contended that such a discrep ancy also exists with respect to the date of cause of action inasmuch as going by Section 9 application the alleged debt fell due on and from November, 2011 and as per the Demand Notice the so-called debt fell due on and from 9th July, 2012 and in either case, Section 9 application was barred by limitation as it was filed only in the year 2018. To wit, beyond 3 years from the alleged default. The benefit of exclusion of period under Section 22(5) of the SICA is not available to the appellant for comput ing the period of limitation in respect of an application under Section 9, IBC, it is further contended. According to the respondent, Section 22 (1), SI CA did not accord a blanket protection against running of cause of action and it is intended to suspend legal proceedings of coercive nature so as to secure assets of an enterprise. In other words, the contention is that filing application for recovery was permissible and Section 22 (1), SICA did not forbid the same and it interdicted only execution or distress or the like against the properties of the industrial company conce rned in the contingencies contemplated thereof.
¶8When Sections 8 and 9, IBC came into force only with effect from 01.12.2016, the question of initiation of the CIRP by filing an application under Section 9 was possible only from 01.12.2016. But the question is whether any party, which falls under th e expression ‘Operational Creditor’ under the IBC claims to have opera tional debt 1 (2006) 13 SCC 322 due from an industrial company and the cause of action for recovery of the same had accrued much earlier than 01.12.2016, but prevented from enforcing the right against such company in view of statutory prohibition under Section 22 (1), SICA, could initiate CIRP despite the passage of three years since the cause of action claiming the protection of exclusion of the period of suspension by virtue of Section 22 (5), SICA?
8.1 In that context it is only apt to refer to the afore-ment ioned relevant provisions under SICA. Section 22(1), SICA was as follows: “22. Suspension of legal proceedings, contracts, etc . – (1) Where in respect of an industrial company, an inquiry under section 16 is pending or any scheme referred to under sectio n 17 is under preparation or consideration or a sanct ioned scheme is under implementation or where an appeal u nder section 25 relating to an industrial company is pending, then , notwithstanding anything contained in the Companies Act, 1956 (1 of 1956) or any other law or the memorandum and articles of association of the industrial company or any other instrument having effect under the said Act or other la w, no proceedings for the winding up of the industrial company o r for execution, distress or the like against any of the pro perties of the industrial company or for the appointment of a rec eiver in respect thereof [and no suit for the recovery of mo ney or for the enforcement of any security against the ind ustrial company or of any guarantee in respect of any loans or advance granted to the industrial company] shall lie or be proceeded with further, except with the consent of the Bo ard or, as the case may be, the Appellate Authority.”
8.2 Section 22(5), SICA, relied on by the appellant for seeki ng exclusion of the period from 31.08.2010 to 01.12.2016 while computing the period of limitation, was as hereunder: - “22. Suspension of legal proceedings, contracts, etc . –
(1)…
(2)…
(3)…
(4)…
(5) In computing the period of limitation for the enforce ment of any right, privilege, obligation or liability, the period dur ing which it or the remedy for the enforcement thereof remains suspended under this section shall be excluded.”
¶9Thus, Section 22 (1), SICA as extracted above, would make it clear that there was a statutory bar to take to any pr oceeding for realisation of a right referred to in the said Section against an industrial company when once an enquiry under Section 16, SICA is pending against it or any scheme referred to under Section 17 thereof is under preparation or consideration or a sanctioned scheme is under implementation or where an appeal under Section 25 relating to an industrial company is pending, except with the consent of the Board or the Appellate Authority, as the case may be. As noticed ear lier, SICA came to be repealed and IBC came into force (Sections 7 to 9 and various other Sections), on the same day viz, on 01.12.2016.
¶10A two-Judge Bench decision of this Court in Paramjeet Singh Patheja’s case (supra), more particularly, paragraph 43 (vii), is relied on by the appellant to support its claim fo r exclusion of the period from 31.08.2010 to 01.12.2016 while computing t he period of limitation for filing applicants under Section 9, IB C. It, in so far as relevant reads thus: - “43. For the foregoing discussions we hold:
(i)
(ii)
(iii)
(iv)
(v)
(vi) ………
(vii) It is a well-established rule that a provisio n must be construed in a manner which would give effect to its purpose and to cure the mischief in the light of which it was enact ed. The object of Section 22, in protecting guarantors from legal proceedings pending a reference to BIFR of the prin cipal debtor, is to ensure that a scheme for rehabilitation would not be defeated by isolated proceedings adopted against the guarantors of a sick company. To achieve that purpos e,it is imperative that the expression “suit” in Section 22 be given its plain meaning, namely, any proceedings adopted for realization of a right vested in a party by law. Th is would clearly include arbitration proceedings.” (Emphasis added)
¶11In the light of the position settled thus, in Paramjeet Singh Patheja’s Case (supra), it is relevant to refer to an earlier two-Judge Bench decision of this court in Kailash Nath Agarwal and Ors. v. Pradeshiya Industrial & Investment Corporation of U.P. Ltd. and Anr. 2 That was also a case, involving consideration of the question as to whether Section 22, SICA, afford protection to guar antors of sick company or only to the sick company. It is relevant to note in this context that the decision in Kailash Nath Agarwal’s Case (supra) was not brought to the notice of the later bench while deciding Paramjeet Singh Patheja’s Case (supra) . In other words, the latter case was decided per incuriam . In Kailash Nath Agarwal’s Case , after considering contentions akin to those raised in Paramjeet Singh Patheja’s Case , this court held that the words “proceedings” and again “suit” had to be construed differently as carrying different meanings, since, they had been raised to denote different things. It was concluded that Section 22
(1), SICA only prohibits recovery against the industrial compa ny and there would be no protection offered to guarantors against the recovery proceedings.
¶12The above conflicting decisions need not detain us from considering the issue further in the light of a subsequen t three-Judge Bench decision of this court in KSL & Industries Ltd. Vs. M/s. Arihant Threads Ltd 3. The three-judge bench, after noting the contentions raised before and the findings of the two-judge bench in Kailash Nath Agarwal’s case (supra), found that it did not deal with the question regarding the scope of protection afforded to the industrial com pany concerned, under Section 22 (1) of SICA. Having observed thus , the three-Judge Bench went on to consider the said question. In that regard, paragraphs 32, 33 and 53 are relevant and reads thus: 2 (2003) 4 SCC 305 3 (2015) 1 SCC 166 “32. As observed earlier, Sub-section (1) of Section 22 may be divided into two parts. In one part, it provides that “no proceedings’’ be instituted for the winding up of the industr ial company or for execution, distress or the like against any of the properties of such industrial company, and in the se cond part it provides that “no suit” for the recovery of money or for the enforcement of any security against the ind ustrial company or of any guarantee in respect of any loans or advances granted to the industrial company, “shall lie or b e proceeded with further, except with the consent of the Bo ard or, as the case may be, the Appellate Authority.”
¶33 Undoubtedly, the present proceedings viz. “appl ication for recovery” cannot specifically be described as proceeding s for execution, distress or the like against any of the pro perties, but it is certainly a proceeding which results in and in fact had resulted in the execution and distress against the prop erty of the Company and is therefore liable to be constru ed as a proceeding for the execution, distress or the like agai nst any of the properties of the industrial company. We are of the view that such a construction would be within the intendment of Parliament wherever the proceedings for recovery of a debt which has been secured by a mortgage or pledge of t he property of the borrower are instituted. Surely, th ere is no purpose in construing that Parliament intended that such an application for recovery by summary procedure should lie or be proceeded with, but only its execution be interd icted or inhibited especially. In this context, it may be remembered that the proceedings by way of an application for recove ry according to a summary procedure as provided under the RDDB Act are not referred to in Section 22 simply b ecause the RDDB Act had not then been enacted.
¶53Moreover, we have found nothing contrary in the intention of the SICA to exclude a recovery application from the purv iew of Section 22, indeed there could be no reason for such exclusion since the purpose of the provision is to protect the properties of a sick company, so that they may be dealt with in the best possible way for the purpose of its revival by the BIFR. In State of Punjab v. The Okara Grain Buyers Syndicate Ltd. MANU/SC/0023/1963: AIR 1964 SC 669, the Court articulated the importance of preserving the benefi cent purpose of the statute and observed:
¶14… We shall therefore proceed to examine the provisions of the Act on the footing that the test for determi ning whether the Government is bound by a statute is whether it is expressly named in the provision which it is contend ed binds it, or whether it “is manifest that from the terms o f the statute, that it was the intention of the legislature that it shall be bound”, and that the intention to bind would be clearly made out if the beneficent purpose of the st atute would be wholly frustrated unless the Government we re bound.”
¶13Thus, it is obvious that the three-Judge Bench in KSL & Industries Ltd. (supra) considered the question whether a recovery application under the Recovery of Debts Due to Banks and F inancial Institutions Act, 1963 (RDDB Act) would lie or be proceeded with against a sick company in view of the Bar contained in Section 22 (1) of SICA. Evidently, even after finding that an ‘application for recovery ’ under RDDB Act could not specifically be described as proce edings for execution, distress or the like against any of the properties, it was held that it is certainly a proceeding which may result in the execution and distress against the property of the company and is therefore , liable to be construed as a proceeding for the execution, distress or the like against any of the properties of the industrial company. Accordingly, it was held that such a construction would be within the intendment of the Parliament. Moreover, it was held therein that there would be no purpose in construing the Parliament intended that such an application for recovery by summary procedure should lie or be proceeded with, but only its executio n be interdicted or inhibited. That apart the three-Judge Bench found nothing contrary in the intention of the SICA to exclude a recovery application from the purview of a Section 22 thereof, taking note of the fact that the purpose of the said provision is to protect the properties of sick company, so that they may be dealt with in the best possible way for the purpose of its revival by BIFR.
¶14In view of the provisions under Section 22 (1) of SICA and the decisions in Paramjeet Singh case (Supra) and in KSL & Industries Limited (supra) , it is worthwhile to note that in the case on hand it was the industrial company (respondent herein) that approached th e BIFR under the provisions of SICA and got it declared as ‘sick company’ by filing Case No. 13 of 2010; that it is thereafter that the app ellant filed Miscellaneous Application No. 432/2013 thereon praying, inter-alia, to permit it under Section 22 of SICA to approach a Civil Court of appropriate jurisdiction for recovery of the above-mentioned dues along with interest; that the said application was disposed of only on 09.0 9.2015, as per Annexure-A40 proceedings, that too, only with a dire ction to the respondent company to incorporate the dues of the app licant in the DRS and that as per Annexure-A40, Case No.13 of 2010 and M.A. No. 292/2014 filed thereon, were then, posted for hearing. In short, Case No. 13 of 2010 was pending before the BIFR when SI CA was repealed w.e.f. 01.12.2016 and Sections 8 and 9, IBC took its effect from 01.12.12016. Thus, obviously, proceedings under SICA were then pending before the BIFR when the default from the p art of the respondent allegedly occurred and by virtue of Section 22 (1), SICA and the decisions referred above, the appellant could n ot have, then, resorted to any legal proceedings for enforcing any right w hich may result in recovery from the properties of the responden t company. For the same reasons, the contention of the respondent that pending the proceedings before the BIFR the appellant could have resorted to arbitration proceedings also has to fail.
¶15Now, we will have to consider the purported intent of Section 22 (5), SICA. The intention appears to be to protect the interest of such a party who was prevented from lawfully enforcing the right to seek for recovery of dues during the operative period of the bar under Section 22
(1), SICA, if it is otherwise available even after the conclusion of proceedings before the BIFR, to the extent specifically mentioned therein. According to us, any other understanding of the provisions under Section 22 (5) would be wholly pointless and purposeless. When the appellant being a party to BIFR in the sense, on intervention obtained an order to the respondent company to incorporate its dues in the Draft Rehabilitation Scheme (DRS) in an application seeking permission to effect recovery of the dues and such a stage had not reached till 01.12.2016, whethe r there would be any justification to hold that on the repeal o f SICA it could not claim the benefit flowing from the provisions under Section 22
(5) of SICA, subject to the provisions under the relevant laws governing the appropriate forum chosen?
¶16In the contextual situation, it is apropos to refer to Section 252 of IBC which reads thus: - “252. The Sick Industrial Companies (Special Provisi ons) Repeal Act, 2003 shall be amended in the manner specif ied in the Eighth Schedule.”
16.1The Eighth Schedule would reveal the nature and manner of amendment specified thereunder as substitution to sub-clause (b) of Section 4, of SICA Repeal Act, 2003 w.e.f. 01.12.2016, as hereunder: “(b) On such date as may be notified by the Central Government in this behalf, any appeal preferred to the Appellate Authority or any reference made or inquiry pendin g to or before the Board or any proceeding of whatever nature pending before the Appellate Authority or the Board under the Sick Industrial Companies (Special Provisions) Act, 1985 (1 of 1986) shall stand abated: Provided that a company in respect of which such appeal or reference or inquiry stands abated under this clause may make reference to the National Company Law Tribunal under the Insolvency and Bankruptcy Code, 2016 within one hundred and eighty days from the commencement of the Insolvency and Bankruptcy Code, 2016 in accordance with the provisions of the Insolvency and Bankruptcy Code, 2016: Provided further that no fees shall be payable for making such reference under Insolvency and Bankruptcy Code, 2016 by a company whose appeal or reference or inquiry s tands abated under this clause.”. (Emphasis added)
¶17A perusal of the substituted sub-clause (b), as extracted above would reveal that reference made or inquiry pending or any proceeding of whatever nature, before the Board under SICA would stand a bated upon its notification by the Central Government. The first pro viso to sub-clause (b) only makes reference to the time limit applicable to the company in respect of which the appeal or reference or enquiry or any such proceeding thus stood abated under the said sub-clause. Going by the said proviso, such a company may make reference to NCLT under IBC within 180 days from the commencement of IBC and in accordance with the provisions thereof. Subsequently, the stated amendment w as notified by the Central Government under S.O. 3569 (E) dated 25.11.2016. It is thus clear that on account of repeal of SICA under Repeal Act (1 of 2003) w.e.f. 01.12.2016, any pending proceeding or enquiry under SICA, initiated by an industrial company would get abated and the prescription of such period of 180 days became applicable only to such a company. A scanning of the stated sub-clause (b) and the provisos would not reveal or indicate prescription of any such specific time limit as regards the opposite parties in the abated reference, inquiry or p roceeding for proceeding with their available remedy under IBC. I n the said circumstances, if such an opposite party falls within the expression ‘operational creditor’, under IBC, it could only be taken that it should be governed by the provisions under the IBC in regard to the p eriod of limitation for approaching the Adjudicating Authority. In this context, it is also relevant to note that as relates the company whose re ference or inquiry or any proceeding got abated, as mentioned, it need not pay any fee for making reference under IBC, in terms of the second proviso to the substituted sub-clause (b) of Section 4 of the SICA R epeal Act. Needless to say, that this exemption is not available to other parties to the abated proceedings, or reference or inquiry concerned.
¶18Section 6, IBC provides that where any corporate debtor commits a default, a financial creditor, an operational credit or or the corporate debtor itself may initiate CIRP in respect of such corporate debtor in the manner provided under Chapter II of IBC. Section 8, which falls under Chapter II, deals with insolvency resolution by operational creditor. It provides that an operational creditor may, on the occurrence of default, deliver a demand notice of unpaid of operational debt or copy of an invoice demanding payment of the amount involved in the default to the corporate debtor in such form and manner as may be prescribed. It is apposite to note that a seemingly printing error ha d occurred in Section 8 (1), IBC inasmuch as instead of ‘a demand notice of unpaid operational debt’ it is printed as ‘a demand notice of unpaid operational debtor.’ Evidently, this must have occurred as in the Gazette Notification also the word ‘debtor’ is following the words ‘unpaid operational’. The word ‘debtor’ used therein has to be split into ‘debt’ and ‘or’ so as to serve the purpose and to give the intended meaning to Section 8 (1) and this view would get support from sub-section (2) of Section 8 itself. Sub-section 2 of Section 8, IBC in so far as it is relevant, reads thus: - “8. (1) ….
(2) The corporate debtor shall, within a period of ten days of the receipt of the demand notice or copy of the inv oice mentioned in sub-section (1) bring to the notice of the operational creditor—
(a) existence of a dispute, if any, or record of th e pendency of the suit or arbitration proceedings filed before the rec eipt of such notice or invoice in relation to such dispute;
(b) the payment of unpaid operational debt— (Underline supplied)
¶19So also, the said position is evident from Rule 5 of the Insolvency and Bankruptcy (Application to Adjudicating Authority) Rules, 2016 (for short ‘the Rules’). Going by the instruction in Form 3, in which a Demand Notice is to be delivered to the corporate debtor under ‘the Rules’, the said from has to be served on the corporate debtor, ten days in advance of filing an application under Section 9 of the Code. This instruction can only be construed that it shall be served on the corporate debtor not less than ten days in advance of filing an application under Section 9 of the Code for the simple reason that the period of limitation for f iling an application under Section 9, IBC is governed by Section 238 A, IBC and therefore, it could not be construed that Section 9 application should invariably be filed on the eleventh day of service of advanc e demand notice in Form 3. Section 238 A, IBC, dealing with period of limitation, has come into force w.e.f. 06.06.2018 and it reads thus: - “238A. Limitation. – The provisions of the Limitation Act, 1963 (36 of 1963) shall, as far as may be, apply to the pro ceedings or appeals before the Adjudicating Authority, the N ational Company Law Appellate Tribunal, the Debt Recovery Tribunal or the Debt Recovery Appellate Tribunal, as the case m ay be.”
¶20Obviously, Section 238A, IBC makes the provisions of the Limitation Act, 1963 applicable to computation of the period of limitation in regard to proceedings before the Adjudicating Authority and the other forums. This position is made explicitly clear in the decision of this Court in B.K. Educational Services Private Limited v. Parag Gupt a and Associates 4 at paragraphs 43 and 48 and they read thus: - 4 (2019) 11 SCC 633 “43. It will be seen from a reading of Section 8 (2) (a) that t he corporate debtor shall, within a period of 10 days of the receipt of the demand notice, bring to the notice o f the operational creditor the existence of a “dispute”. We have seen that “dispute” as defined in Section 5 (6) includes a suit or arbitration proceeding relating to certain matters. Again, under Section 8 (2) (a), the corporate debtor may, in the alternative, disclose the pendency of a suit or arb itration proceedings filed before the receipt of the demand not ice. It is clear therefore, that at least in the case of an oper ational creditor, “default” must be non-payment of amounts that have become due and payable in law . The “dispute” or pendency of a suit or arbitration proceedings would necessarily br ing in the Limitation Act, for if a suit or arbitration proc eeding is time-barred, it would be liable to be dismissed. This again i s an important pointer to the fact that when the expr ession “due” and “due and payable” occur in Sections 3(11) and 3
(12) of the Code, they refer to a “default” which i s non-payment of a debt that is due in law i.e. that such debt is n ot barred by the law of limitation. It is well settled that where the same word occurs in a similar context, the draftsman of the statute intends that the word bears the same meanin g throughout the statute (see Bhogilal Chunilal Pandya v. State of Bombay 1959 Supp (1) SCR 310, AIR 1959 SC 356, 1959 Cri LJ 389, Supp SCR at pp. 313-14). It is thus clear that t he expression “default” bears the same meaning in Section s 7 and 8 of the Code, making it clear that the corporate insolvency resolution process against a corporate debtor can o nly be initiated either by a financial or operational cred itor in relation to debts which have not become time-barred.
¶48It is thus clear that since the Limitation Act is applic able to applications filed under Sections 7 and 9 of the Code fr om the inception of the Code, Article 137 of the Limita tion Act gets attracted. “The right to sue”, therefore, accrues when a default occurs. If the default has occurred over thr ee years prior to the date of filing of the application, the ap plication would be barred under Article 137 of the Limitation Act, save and except in those cases where, in the facts of th e case, Section 5 of the Limitation Act may be applied to condone the delay in filing such application.” (emphasis supplied)
¶21The decision in B.K. Educational Services Private Limited (supra) would thus reveal that Articles 137 and 5 of the Limitation Act, 1963 are applicable to applications filed under Sections 7 and 9 of IBC. It be so, the position is that the period of limitation is three years from the right to apply accrues but the delay is condonable on sufficient grounds. It is to be noted that the third column in Article 137 of the Limitation Act posits that time runs when the ‘right to apply accrues’. In the decision in Babulal Vardharji Gurjar v. Veer Gurjar Aluminium I ndustries Private Limited and Anr. 5 this Court considered the question as to when ‘right to apply would accrue?’ Paragraph 32 of the said decision, in so far as it is relevant for the purpose of this case reads thus: - “32. When Section 238-A of the Code is read with the above noted consistent decisions of this Court in Innoven tive Industries [Innoventive Industries Ltd. v. ICICI Bank, (2018) 1 SCC 407], B.K. Educational Services [B.K. Educati onal Services (P) Ltd. v. Paras Gupta & Associates, (2019) 11 SCC 633], Swiss Ribbons [Swiss Ribbons (P) Ltd. v. Union of Ind ia,
(2019) 4 SCC 17], K. Sashidhar [K. Sashidhar v. Ind ian Overseas Bank, (2019) 12 SCC 150], Jignesh Shah [Jigne sh Shah v. Union of India, (2019) 10 SCC 750], Vashdeo R. Bhojwani [Vashdeo R. Bhojwani v. Abhyudaya Coop. Ba nk Ltd., (2019) 9 SCC 158], Gaurav Hargovindbhai Dave [Gaurav Hargovindbhai Dave v. Asset Reconstruction Co. (India) Ltd. ,
(2019) 10 SCC 572] and Sagar Sharma [Sagar Sharma v. Phoenix ARC (P) Ltd., (2019) 10 SCC 353] respectively , the following basics undoubtedly come to the fore:
(a) that the Code is a beneficial legislation intended to put the corporate debtor back on its feet and is not a mere money recovery legislation;
(b) that CIRP is not intended to be adversarial to the corporate debtor but is aimed at protecting the inter ests of the corporate debtor; 5 (2020) 15 SCC 1
(c) that intention of the Code is not to give a new lease of life to debts which are time-barred;
(d) that the period of limitation for an application seeking initiation of CIRP under Section 7 of the Code is gov erned by Article 137 of the Limitation Act and is, theref ore, three years from the date when right to apply accrues;
(e) that the trigger for initiation of CIRP by a fina ncial creditor is default on the part of the corporate debtor, that is to say, that the right to apply under the Code accrues on t he date when default occurs;
(f) that default referred to in the Code is that of actual non-payment by the corporate debtor when a debt has become due and payable; and
(g) that if default had occurred over three years pri or to the date of filing of the application, the application would be time-barred save and except in those cases where, on facts, the delay in filing may be condoned; and
(h) an application under Section 7 of the Code is not for enforcement of mortgage liability and Article 62 of the Limitation Act does not apply to this application.
¶22The following relevant recitals from paragraphs 34, 34.1, 38 and 38.1 are worthy to be noted in the above context and they read thus:- “34……….. As noticed, in B.K. Educational Services [ B.K. Educational Services (P) Ltd. v. Paras Gupta & Asso ciates,
(2019) 11 SCC 633, it has clearly been held that the limitation period for application under Section 7 of the Code is three years as provided by Article 137 of the Limitation Act, whic h commences from the date of default and is extendable o nly by application of Section 5 of the Limitation Act, if any case for condonation of delay is made out. The findings i n para 12 in Jignesh Shah [Jignesh Shah v. Union of India, (2019) 10 SCC 750] makes it clear that the Court indeed applied the principles so stated in B.K. Educational Services [ B.K. Educational Services (P) Ltd. v. Paras Gupta & Asso ciates,
(2019) 11 SCC 633], and held that the winding-up peti tion filed beyond three years from the date of default was barred by time.
34.1. Even in the later decisions, this Court has consiste ntly applied the declaration of law in B.K. Educational Servi ces [B.K. Educational Services (P) Ltd. v. Paras Gupta & Associates, (2019) 11 SCC 633]. As noticed, in Vash deo R. Bhojwani [Vashdeo R. Bhojwani v. Abhyudaya Coop. Ba nk Ltd., (2019) 9 SCC 158], this Court rejected the cont ention suggesting continuing cause of action for the purpo se of application under Section 7 of the Code while holding that the limitation started ticking from the date of iss uance of recovery certificate dated 24-12-2001. Again, in Ga urav Hargovindbhai Dave [Gaurav Hargovindbhai Dave v. As set Reconstruction Co. (India) Ltd., (2019) 10 SCC 572], wher e the date of default was stated in the application under Sect ion 7 of the Code to be the date of NPA i.e. 21-7-2011, this Court held that the limitation began to run from the date of NPA and hence, the application filed under Section 7 of the Co de on 3-10-2017 was barred by limitation.
¶38The question as to whether date of enforcement of the Code (i.e. 1-12-2016) provides the starting point of limita tion for an application under Section 7 of the Code and hence, the application in question, made in the year 2018, is with in limitation, is not even worth devoting much time. A bare l ook at para 21 of the impugned order [Babulal Vardhaji Gur jar v. Veer Gurjar Aluminium Industries (P) Ltd., 2019 SCC OnLine NCLAT 295] leaves nothing to guess that such observations by the Appellate Tribunal had only bee n assumptive in nature without any foundation and without any basis. There is nothing in the Code to even remotely indica te if the period of limitation for the purpose of an a pplication under Section 7 is to commence from the date of commencement of the Code itself. Similarly, nothing provided in the Limitati on Act could be taken as the basis to support the proposition s o stated by the Appellate Tribunal. In fact, such obs ervations had been in the teeth of law declared by this Court i n B.K. Educational Services [B.K. Educational Services (P) L td. v. Paras Gupta & Associates, (2019) 11 SCC 633].
38.1. It appears that at the given point of time, NCLA T had been readily adopting such a proposition in other cases t oo, so as to treat similar applications within limitati on. This approach of NCLAT was specifically disapproved by this Court in Sagar Sharma [Sagar Sharma v. Phoenix ARC (P) Lt d.,
(2019) 10 SCC 353] where, after observing that in B .K. Educational Services [B.K. Educational Services (P) L td. v. Paras Gupta & Associates, (2019) 11 SCC 633] it had already been made clear that the date of the Code’s coming into force on 1-12-2016 was wholly irrelevant to the triggering o f any limitation period for the purposes of the Code, thi s Court said : (Sagar Sharma case [Sagar Sharma v. Phoenix ARC
(P) Ltd., (2019) 10 SCC 353], SCC p. 354, para 3) “3. Article 141 of the Constitution of India mandates that our judgments are followed in letter and spirit. The date of com ing into force of the IB Code does not and cannot form a trigger point of limitation for applications filed under th e Code. Equally, since “applications” are petitions which a re filed under the Code, it is Article 137 of the Limitation Act w hich will apply to such applications.”
23.The above -mentioned positions settled with respect to Section 7, IBC will proprio vigore apply to Section 9, IBC. In short, as relates an application under Section 9, IBC the date of coming into for ce of IBC, viz, 01.12.2016 would not form the trigger point of limitation and the period of limitation for an application for initiating of CI RP under Section 9, IBC would be three years from the date when the right to apply accrues as provided by Article 137 of the Limitation Act and further that the right to apply under the IBC would accrue on the date when default occurs and it is extendable only by application of Section 5 of the Limitation Act. In view of the nature of the provision under SICA and the nature of the orders issuable by the BIFR and the positions q ua an application for initiation of CIRP under Section 9 of IBC, referred above, we think it absolutely unnecessary to delve into the question of applicability or otherwise of Section 14 of the Limitation Act in regard to proceedings under Section 9, IBC as the same provides only for exclusion of time of proceedings bona fide in Court without jurisdiction.
¶24When the limitation period for initiating CIRP under Section 9, IBC is to be reckoned from the date of default, as opposed to the date of commencement of IBC and the period prescribed therefor, is three years as provided by Section 137 of the Limitation Act, 1963 and th e same would commence from the date of default and is extendable only b y application of Section 5 of the Limitation Act, 1963 it is incumbent on the Adjudicating Authority to consider the claim for condonation of the delay when once the proceeding concerned is found filed beyond the period of limitation.
¶25As relates Section 5 of the Limitation Act showing ‘sufficient cause’ is the only criterion for condoning delay. ‘Sufficient Cause’ is the cause for which a party could not be blamed. We have already taken note of the legal bar for initiation of proceedings ag ainst an industrial company by virtue of Section 22 (1), SICA and obviously, when a party was thus legally disabled from resorting to legal proceeding for recovering the outstanding dues without the permission of BIFR and even on application permission therefor was not given the period of suspension of legal proceedings is excludable in computing the period of limitation for the enforcement of such right in terms of Section 22(5), SI CA. In the absence of provisions for exclusion of such period in respect of an application under Section 9, IBC, despite the combined reading of Section 238A, IBC and the provisions under the Limitation Act what is legally available to such a party is to assign the same as a suffici ent cause for condoning the delay under Section 5 of the Limitation Act. In such eventuality, in accordance with the factual position obtaine d in any particular case viz., the period of delay and the perio d covered by suspension of right under Section 22 (1), SICA etc., the question of condonation of delay has to be considered lest it will result in injustice as the party was statutorily prevented from initiating ac tion against the industrial company concerned. The first question formulated hereinbefore is accordingly answered.
¶26In the case on hand, indubitably, the question whether the delay occurred in the matter of filing of application under Section 9, IBC is condonable or not, was not considered. A bare perusal of the impugned order would reveal that after taking into account the date of default and the date of filing of the application under Section 9, IBC the NCLAT held it as time barred. When once it is so found we would have remanded the matter for consideration of the question of limitation afresh, but for the fact that the application under Section 9, IBC was dismissed assigning reason of existence of ‘pre-existing dispute’ as well.
¶27The appellant and the respondent have cited various decisions in support of their rival contentions on the sustainability or otherwise of the dismissal of the stated application on the ground of exist ence of ‘pre-existing dispute(s)’ between the parties. Nonetheless, w e are of the considered view that in that regard, only the decisions to be referred infra, require consideration. Paradoxically, both sides relied on the decision of this Court in Macquarie Bank Limited v. Shilpi Cable Technologies Limited 6.
¶28Macquarie Bank Limited’s case (supra) is relied on by the appellant to drive home the point that production of the certifi cate/ statement from the financial institution maintaining the accounts of the operational creditor concerned, under Section 9 (3)(c), IBC, is not a condition precedent to trigger CIRP and hence, its insistence will be violative of the law laid down thereunder. In Macquarie Bank Limited (supra), in paragraph 16, this Court held: - “16. When we come to clause (c) of Section 9(3), it is equally clear that a copy of the certificate from the financial insti tution maintaining accounts of the operational creditor confir ming that there is no payment of an unpaid operational debt by the corporate debtor is certainly not a condition prece dent to triggering the insolvency process under the Code. T he expression “confirming” makes it clear that this is only a pi ece of evidence, albeit a very important piece of evidence, w hich only “confirms” that there is no payment of an unpa id operational debt. This becomes clearer when we go to clause
(d) of Section 9(3) which requires such other information a s may be specified has also to be furnished along wit h the application.”
¶29This position is thus fairly settled, as above. On the other hand, the respondent relied on the said decision to buttress its contention that existence of ‘pre-existing dispute’ should ent ail dismissal of application under Section 9, IBC.
¶30In Macquarie Bank Limited (supra), this Court held, at paragraphs, 13 and 14 thus: - “13.The first thing to be noticed on a conjoint rea ding of Sections 8 and 9 of the Code, as explained in Mobil ox 6 (2018) 2 SCC 674 Innovations (P) Ltd. v. Kirusa Software (P) Ltd. (2018) 1 SCC 353, decided on 21-9-2017 at paras 33 to 36, is that Section 9(1) contains the conditions precedent for triggering the Code insofar as an operational creditor is concerned. The requisite elements necessary to trigger the Code are:
(i) occurrence of a default;
(ii) delivery of a demand notice of an unpaid opera tional debt or invoice demanding payment of the amount involved; and
(iii) the fact that the operational creditor has no t received payment from the corporate debtor within a period of 10 days of receipt of the demand notice or copy of invoice demanding payment, or received a reply from the corporate debtor whic h does not indicate the existence of a pre-existing d ispute or repayment of the unpaid operational debt.
14.It is only when these conditions are met that an applicati on may then be filed under Section 9(2) of the Code in the prescribed manner, accompanied with such fee as has been prescribed ...” (emphasis supplied)
¶31In the decision in Innoventive Industries Ltd. v. ICICI Bank and Anr. 7, at paragraph 29, this Court held thus: - “29 . The scheme of Section 7 stands in contrast with th e scheme under Section 8 where an operational creditor is, on the occurrence of a default, to first deliver a demand notice of the unpaid debt to the operational debtor in the manner provided in Section 8(1) of the Code. Under Section 8(2), the corporate debtor can, within a period of 10 days of r eceipt of the demand notice or copy of the invoice mention ed in sub-section (1), bring to the notice of the operational credi tor the existence of a dispute or the record of the pendency o f a suit or arbitration proceedings, which is pre-existin g — i.e. before such notice or invoice was received by the corpor ate debtor. The moment there is existence of such a dispute, the operational creditor gets out of the clutches of the C ode.” 7 (2018) 1 SCC 407
¶32A scanning of the decisions referred supra, would reveal that existence of a ‘pre-existing dispute’ should entail dismissal of an application filed under Section 9 IBC at the threshold. Theref ore, the question is whether the respondent had raised a dispute describable as a ‘pre-existing dispute’ so as to entail dismissal of application of the appellant under Section 9, IBC. In Mobilox Innovations (P) Ltd. (supra), particularly at paragraphs 33 and 51, this Court held thus: - “33.The scheme under Sections 8 and 9 of the Code, appears to be that an operational creditor, as defined, may , on the occurrence of a default (i.e. on non-payment of a debt, any part whereof has become due and payable and has not been repaid), deliver a demand notice of such unpaid operati onal debt or deliver the copy of an invoice demanding payment of such amount to the corporate debtor in the form set out in Rule 5 of the Insolvency and Bankruptcy (Applicatio n to Adjudicating Authority) Rules, 2016 read with Form 3 or 4, as the case may be [Section 8 (1)]. Within a period of 10 days of the receipt of such demand notice or copy of invo ice, the corporate debtor must bring to the notice of the operat ional creditor the existence of a dispute and/or the recor d of the pendency of a suit or arbitration proceeding filed before t he receipt of such notice or invoice in relation to suc h dispute [Section 8(2)(a)]. What is important is that the exist ence of the dispute and/or the suit or arbitration proceeding must be pre-existing i.e. it must exist before the receipt of the demand notice or invoice, as the case may be . […] It is only if, after the expiry of the period of the said 10 days, the operat ional creditor does not either receive payment from the cor porate debtor or notice of dispute, that the operational creditor ma y trigger the insolvency process by filing an application bef ore the adjudicating authority under Sections 9(1) and 9(2). [. .. ] It may also reject the application if the notice of dis pute has been received by the operational creditor or there is a rec ord of dispute in the information utility [Section 9(5) (ii)(d)}. Section 9(5)(ii)(d) refers to the notice of an existi ng dispute that has so been received, as it must be read with Section 8(2)(a). Also, if any disciplinary proceeding is pending against any proposed resolution professional, the applicati on may be rejected [Section 9(5)(ii)(e)].
¶51It is clear, therefore, that once the operationa l creditor has filed an application, which is otherwise comple te, the adjudicating Authority must reject the application under Section 9(5)(2)(d) if notice of dispute has been re ceived by the operational creditor or there is a record of dispute i n the information utility. It is clear that such notice mus t bring to the notice of the operational creditor the “existen ce” of a dispute or the fact that a suit or arbitration proc eeding relating to a dispute is pending between the parties. There fore, all that the adjudicating Authority is to see at this stage is whether there is a plausible contention which requires furthe r investigation and that the “dispute” is not a patent ly feeble legal argument or an assertion of fact unsupported by evidence. It is important to separate the grain from the cha ff and to reject a spurious defence which is mere blus ter. However, in doing so, the Court does not need to be satis fied that the defence is likely to succeed. The Court doe s not at this stage examine the merits of the dispute except to the extent indicated above. So long as a dispute truly exists in fact a nd is not spurious, hypothetical or illusory, the adju dicating Authority has to reject the application. ” (emphasis supplied)
¶33In the light of the positions thus settled by this Court in Macquarie Bank Limited (supra) and Mobilox Innovations (P) Ltd. (supra), we will examine the question whether there was a ‘pre-existing dispute’ between the parties, warranting dismissal of the application for initiation of CIRP filed by the appellant.
¶34In this context, it is relevant to note that the Annexure A-41 demand notice under Section 8, IBC was issued by the appellant on
01.04.2017 and the respondent replied the same as per letter Annexure A-42 letter dated 10.04.2017 viz., within 10 days from the date of receipt of Annexure A-41. Evidently, the respondent, in Annexure A-42 reply raised the contentions that there was shortfall in gas supply and t hat it had suffered huge loss due to the disconnection of gas supply. True that, in terms of the decision in Mobilox Innovations (P) Ltd. (supra) what is to be looked into is the existence or otherwise of a dispute and/or the suit or arbitration proceedings prior to the receipt of demand notice or invoice, as the case may be. In the case on hand, as noticed earlier, the appellant had issued a demand notice under Section 8, IBC read with the Rule 5 of 2016 Rules on 01.04.2017. Obviously, the NCLT and NCLAT referred to a letter dated 04.01.2013 (Annexure A-36 herein) to hol d that existence of a pre-existing dispute between the parti es revealed from the same. The said letter dated 04.01.2013 issued by way of a reply by the respondent to the letter from the appellant dated 03.01.2013, reads thus:- “Date : 04.01.2013 To, The Director, Sabarmati Gas Ltd., Gandhinagar. Respected Sir, Ref : Your letter dated 03.01.2013 We are registered with BlFR vide Case No. 13/2010 pursuant to Section 22 of SICA no coercive recovery can be m ade. Kindly note that abrupt disconnection of Gas Supply t o our Unit is causing heavy losses on account of production . The loss is further exaggerating on account of non-supp ly of material to various parties which includes Railway Board and other Big units. Kindly note that you are responsible for the Direct Loss of Production ranging from Rs. 30-Rs. 50 Lakhs per day a nd also Consequential Losses that may be incurred by u s including Penalties for Non-compliance of contract (or supplies for which you will solely be held responsible. In view of the above subject we agree for payment o f bills and request you to wait (or the old bills payment t ill restructuring is agreed by Honorable BIFR. Hoping for your best co-operation Thanking you, For Shah Alloys Limited Authorized Signatory”
¶35The learned Senior Counsel for the appellant would contend that last para of the said letter dated 04.01.2013 would revea l the fact that the respondent had agreed to effect the payment s or bills and requested only to wait for the old bills payments till restructuring is agreed by BIFR and in other words, non-existence of a dispute. That apart, the appellant heavily relied on paragraph 2.7 and 2.10 (iv) of Annexure 40 which is the proceeding of BIFR in Case No.13 of 2010 dated 09.09.2015, to canvass the position that the contention of the respondent regarding existence of a pre-existing dispute with respect to the dues payable to it, is bereft of any basis. The aforesaid relevant paragraph s in Annexure A-40 are as under: - “2.7 The Bench then took MA No. 432/2013. The ld advocate representing the applicant (Sabarmati Gas Ltd.) sought time to appear prepared in the next date of hearing, sin ce they have been engaged recently in this case. The ld adv ocate representing the company submitted that the applicant is an unsecured creditor and he accepted the dues of the applicant. He assured that their reconciled dues will be taken care of in the DRS, as unsecured creditor and they will be paid as per the terms of DRS, as and when it would be approved by the Board.
2.10 Having considered the submissions made during the hearing and material on record the Bench issued foll owing directions: …
(iv) MA 432 filed by Sabarmati Gas Ltd. is disposed off with the direction to the company to incorporate the dues o f the applicant in the DRS.”
¶36True that paragraph 2.7 of Annexure 40 carries the recording of the submissions made on behalf of the respondent before the BIFR by the learned advocate, as above. Citing all such aspects, t he learned Senior Counsel for the appellant contended that the contention of the respondent regarding ‘pre-existing dispute’ is only a patently feeble legal argument/assertion of fact unsupported by evidence and ther efore, it was to be rejected by the Tribunals. It is further contended by the applicant that directions at paragraph 2.10 (iv) also is relevant in this context as it would reveal that the Misc. Application No.432 of 2013 filed b y the Appellant herein was disposed of with the direction to the re spondent company to incorporate the position of the appellants/applicant therein in the DRS.
¶37Per contra , the learned counsel for the respondent would submit that a scanning of paragraph 2.7 itself would reveal that what was assured by the counsel appearing on behalf of the respondent before the BIFR was not full payment of the amountas claimed by the appellant thereunder and what was assured was that the reconciled dues towards the appellant would be taken care of in the DRS, as unsecured creditor and that it would be paid as per the terms of DRS, as and when it is approved by the Board.
¶38In this context the meaning of the word “reconciliation” is to be looked into. Going by Black’s Law Dictionary, 10 th Edition, the apt meaning suitable to the situation in relation to accounting, reads thus: “an adjustment of amounts so that they agree, especially by all owing for outstanding items”. It is submitted by the learned co unsel for the respondent that such a reconciliation had not taken place and also that indisputably, DRS was not formulated and approved. The aforesaid facts revealed from Annexure 40 together with the stand t aken by the respondent in the letter dated 04.01.2013 (Annexure 36) would reveal the existence of a pre-existing dispute between the parties. In the contextual situation it is only apposite to be remindful of the observation in Mobilox Innovations (P) Ltd. (supra) that in doing the act of separating the grain from chaff the Court need not to be satisfied that the defence is likely to succeed. It is enough that a dispute exists between the parties and in other words, what is to be seen is whether there w as a plausible contention requiring investigation for th e purpose of adjudication. Taking note of the nature of the dispute of the respondent as referred hereinbefore in respect of the claim made by the appellant, we do not find any reason to disagree with the concurrent findings of the Tribunals that there existed a ‘pre-existing dispute’ between the parties before the receipt of demand notice under Section 8, IBC. In other words, the dismissal of the application under Section 9, IBC on the ground of ‘pre-existing dispute’ cannot be held to be patently illegal or perverse. We also do not find any reason, in the facts and circumstances, to hold that the case set up by the respondent was a patently feeble legal argument. At any rate, we are not inclined to brush aside the case of the respondent as spurious. We may hasten to add here that we shall not be understood to have held that the dispute set by the respondent regarding the dues is ultimately to be upheld. Certainly, when the expression ‘pre-existing dispute’ is used it will only indicate the existence of a dispute prior to the receipt of a demand notice under Section 8, IBC, and the correctness or its truthfulness is a matter of evidence . In short, the respondent has succeeded in raising a dispute describable as ‘pre-existing dispute’. In that view of the matter once we find that the Tribunals have rightfully held that there existed a ‘pre-existing dispute ’ between the parties there cannot be an order of remand of the matter to the Tribunal for reconsideration of Section 9 application under IBC.
¶39In the contextual situation, it is also relevant to ref er to the fact, rightly taken note of by the NCLT, that the respondent herein had filed a Commercial Suit No.92 of 2017 on 28.04.2017 before the Commercial Court in Ahmedabad, claiming damages for the loss suffered by it due to discontinuation of gas supply. True that on 12.07.2018, the said Commercial Civil Suit was dismissed by the Commercial Court at Ahmedabad on the ground of being barred by limitation. Annexure-B would reveal that against the judgment of dismissal in the said suit, the respondent herein had filed First Appeal No. 3841 of 2018 before t he High Court of Gujarat at Ahmedabad. It was disposed of on 11.08.2021, taking into account the joint submission that parties be permitted to settle dispute through arbitration process. In this context it is also to be noted that the notice of arbitration dated 29.11.2019 has been issued b y the appellant itself. Recording the submission, the appeal was permitted to be withdrawn leaving the parties to proceed with arbitral process. This fact is not disputed and in fact, it is indisputable in view of Annexure-B, judgment dated 11.08.2021 of the High Court of Gujarat in Misc. First Appeal No.3841 of 2018. In Annexure-B, it is recorded thus:- “Both the learned counsel have taken instructions and h ave jointly submitted that let the parties get their dispu te settled through the arbitration process where learned former Ju dge of this Court, Justice J.C. Upadhyaya (Retired) has a lready been appointed as the arbitrator on 29.11.2019 and since then the matter is pending here.” In this context, it is also relevant to note that Gas Supply Agreement
(GAS) which is an agreement entered into between the appellant and the respondent dated 30.05.2008 in regard to the supply of natural gas, contains an arbitration clause viz., clause No.17. When the agree ment entered into between the parties carries an arbitration clause and when the parties mutually consented and sought to proceed with arb itration before the High Court and further, when the arbitration proceedings are pending, we are of the view that the parties shall be left with the liberty to raise all contentions before the arbitrator, except the legal questions discussed and decided in this judgment.
¶40Subject to the above, this Appeal stands dismissed. All the pending application (s), stand disposed of. Ankit Gyan Appeal dismissed. (Assisted by : Jahanvi Taneja and Mahendra Yadav, L CRAs)
Source: Supreme Court of India, Digital Supreme Court Reports, via the Indian Supreme Court Judgments open dataset (CC BY 4.0). Text was extracted from the official PDF and may contain conversion errors. Check the official PDF before relying on it.